CONDITION-BASED SOLUTIONS

The right system begins with actual conditions

Area function, substrate, exposure, access, and operational constraints should be understood before a system is selected.

Five core services

Choose a service to understand its relevance, system options, evaluation, execution, and limitations.

From symptoms to a technical discussion

The problem matrix is an initial guide, not a final technical recommendation without evaluation of actual conditions.

  • 1

    Dusty, worn, or difficult-to-clean flooring

    Consider Epoxy Flooring for a seamless surface or Polishing Concrete to improve an existing slab. The concrete condition must still be evaluated.

    Explore Epoxy Flooring
  • 2

    The area requires cleanliness or static control

    Self-Leveling Epoxy or Anti-Static / ESD Epoxy may be considered according to the facility function and technical requirements.

    Explore Epoxy Flooring
  • 3

    Leakage, seepage, or moisture is present

    Waterproofing should begin by identifying the water source and direction, area details, structural type, and work access.

    Explore Waterproofing
  • 4

    Steel surfaces show corrosion or deterioration

    Industrial Painting and Protective Coating require suitable Surface Preparation and a coating build-up selected for the exposure.

    Explore Industrial Painting
  • 5

    Structural elements require strengthening

    FRP Structural Strengthening may form part of a solution based on adequate structural evaluation and technical design.

    Explore FRP Structural Strengthening

This information is an initial guide. System recommendations follow evaluation of actual conditions and the agreed scope.

Surface Preparation as a foundation

Preparation is aligned with system requirements and the agreed scope.

  • 1Surface-condition inspection
  • 2Area cleaning
  • 3Grinding where relevant
  • 4Profiling for the system requirement
  • 5Contamination removal
  • 6Crack or hole repair
  • 7Patching within the work scope
  • 8Readiness checks before application

Quality Control and documentation

Checks are performed when relevant to the system and agreed scope.

  • 1Materials and system identification
  • 2Area condition and boundaries
  • 3Application stages
  • 4Curing and area readiness
  • 5Thickness, testing, or documentation where relevant

Information for an initial survey or quotation

Clear context helps direct the initial discussion without replacing actual evaluation.

  • Project location
  • Area type and function
  • Visible condition or issue
  • Approximate size
  • Photos or video of the condition
  • Work access and shutdown window
  • Target timing
  • Drawings or specifications where relevant

Discuss the requirement before choosing a system

Clear context helps direct the survey and initial scope.

Industrial Surface Services | PT Floora Global Utama